    UV-Accelerated Weathering Test Chamber – Wiring Code and Electrical Safety Operating Guide (Official Version)

    Source:LINPIN Time:2025-09-05 Category:Industry News

    The UV-accelerated weathering test chamber is a key item of equipment used to simulate solar radiation and perform accelerated ageing evaluations on materials. Its electrical system must not only drive high-power UV sources but also acquire and control signals for temperature, humidity, spray, etc. Wiring is the first step of installation and commissioning; any error can cause tripping, component burnout or even electric-shock accidents. Consequently, only qualified electricians who hold a “Special Operation Certificate (Low-Voltage Electrical Work)” and who fully understand the chamber’s electrical schematic and local supply regulations are authorised to carry out wiring. This Guide is prepared with reference to GB/T 5226.1-2019 “Electrical Safety of Machinery”, GB 50054-2011 “Code for Design of Low-Voltage Electrical Installations” and current industrial practice. It systematically describes the wiring sequence, neutral and earthing arrangements, voltage-stability requirements and day-to-day power-supply management for laboratory managers, maintenance personnel and third-party installers.
    UV-Accelerated Weathering Test Chamber
    Pre-installation Preparation
    2.1 Unpacking inspection
    a) Check name-plate data: rated supply (normally three-phase five-wire AC 380 V ±10 %, 50 Hz), total power (kW), UV lamp power and heater power.
    b) Verify documents: electrical schematic, wiring diagram, conformity certificate, residual-current device (RCD) characteristic sheet, warranty card.
    c) Confirm no deformation, no loose internal wiring and no damage to insulation.
    2.2 Site survey
    a) Power capacity: chamber power ≤80 % of the outgoing circuit-breaker rating in the laboratory switch-board; reserve 20 % margin for future expansion.
    b) Earthing: building earth resistance ≤4 Ω; for TN-S systems ensure the independent PE bar is reliable.
    c) Environment: ambient 5–35 °C, RH ≤85 %, no severe vibration or corrosive gas; floor level within 2/1000.
    2.3 Tools & consumables
    Insulated gloves and boots, voltage tester, multimeter, 500 V megger, torque wrench, label printer, yellow/green PE wire (≥2.5 mm2), phase sleeves (L1-yellow, L2-green, L3-red), nickel-plated copper lugs (CE), DIN-rail RCD (30 mA, ≤0.1 s).
    Wiring Procedure
    3.1 Isolation & locking-off
    Switch off the upstream feeder; hang “DO NOT SWITCH ON – WORK IN PROGRESS” tag; verify absence of voltage and discharge.
    3.2 Main power cable
    a) Select 5-core 4 mm2 or 6 mm2 Cu PVC cable (RVV or YJV); leave 1.2 m service loop.
    b) Strip with automatic stripper; sleeve cores with correct phase colours; no nicking of conductors.
    3.3 Earthing (PE) system
    a) Connect yellow/green PE to the laboratory earth bar first; bar must be welded to the building equipotential bonding network ≥2 × flat-bar width.
    b) Chamber PE terminal is M6 Cu stud: use double washer + self-locking nut, torque 3.5 N·m, contact resistance <0.1 Ω. c) Forbidden practices: using water/gas pipes or cable-tray supports as earth; linking PE to neutral; earthing via socket earth pin only. 3.4 Neutral (N) conductor Single-phase loads (lamps, fans, control transformer) plus third-harmonic currents from electronic ballasts can raise N-current to 1.2 × phase current. Therefore N must be equal in cross-section (≥4 mm2) and distributed from a Cu bus-bar; no “borrowed” neutrals for other apparatus. 3.5 Phase conductors (L1/L2/L3) Connect in positive sequence (ABC) to avoid ballast phase-sequence alarms. Bending radius ≥8 × cable OD; use PG21 gland, IP54. 3.6 Control circuits Sensor cables (temp./humidity/irradiance) – shielded twisted pair RVVP 2×1.0 mm2, shield earthed at one end only. Keep 24 V control and 380 V power in separate conduits; cross at ≥90° to reduce EMI. 3.7 RCD verification Inject 150 mA fault current with a calibrated tester; trip time ≤40 ms. Monthly, press the built-in “T” button and enter result in the RCD Log Sheet. Voltage Stability & Power Management 4.1 Voltage tolerance GB/T 12325 allows ±7 % on 380 V, but UV lamps are sensitive: 1 % drop in voltage ≈2 % drop in irradiance. Install an AVR (±1 %, ≤50 ms response) if mains variation is large. 4.2 Dedicated circuit Feed the chamber from its own circuit; do not share with air compressors or ovens. Select breaker rating ≥1.25 × rated current, Type D curve to withstand inrush. 4.3 Harmonic control Electronic ballasts can produce THDi ≈25 %. When several chambers share a feeder, calculate neutral harmonic summation; install an active power filter (APF) if THDi >10 %.
    4.4 Power-down sequence
    Switch off lamps, heater and spray circuits first; wait until internal temperature <60 °C, then isolate mains. If UPS is used for data logging, size it for controller only, not lamps, to avoid deep discharge. Maintenance & Service Safety 5.1 Daily checks Inspect PE lug for oxidation or looseness; cable sheath for cracks; RCD indicator normal. 5.2 Periodic insulation test After 48 h shutdown, 500 V megger: power circuit ≥2 MΩ, control circuit ≥1 MΩ. If reading falls >30 %, sectionalise and locate fault.
    5.3 Cleaning
    Before cleaning lamps or reflectors, isolate and lock-off supply. Use anhydrous ethanol and non-woven cloth; live cleaning is forbidden.
    5.4 Fault intervention
    If RCD trips:
    Cannot reset: measure N-PE resistance with multimeter, rule out short.
    Instant trip on reset: unplug lamp modules one by one to locate faulty ballast.
    Never bypass or disable the RCD.
    Conclusion
    The quality of wiring determines the chamber’s service life, test accuracy and personnel safety. Strict compliance with national electrical codes, the sequence “PE first, N second, phases last”, and the principles of “dedicated circuit, stabilised supply, regular verification” are essential. Every user organisation should establish an “Electrical Safety Operation Procedure”, include it in annual training and apply a “one-strike veto” to violations, thereby ensuring true prevention of accidents.

    News Recommendation
    Dust/sand test chambers are environmental simulation devices designed and manufactured in accordance with GB/T 2423.37, IEC 60068-2-68, ISO 20653 and other international standards. They are used to evaluate the sealing reliability and corrosion resistance of locks, automotive/motorcycle parts, seals, power meters and other products under sandstorm conditions.
    As we all know, UV aging test chambers are composed of many components. In fact, there are also some auxiliary accessories that may be used during the operation of the equipment. The use of these accessories can make the testing process smoother. Today, I would like to introduce several such accessories to you.
    With the rapid development of industrial production, temperature and humidity test chambers have become essential equipment for simulating external climatic conditions.
    When a company changes its production location and needs to relocate a thermal shock test chamber, the following precautions must be taken to minimize potential damage to the equipment.
    Safety always serves as the cornerstone of equipment operation, and for specialized equipment like high and low temperature shock test chambers, safety considerations are of utmost importance. Below, we will elaborate on the key safety points that require special attention during the use of high and low temperature shock test chambers.
    Product Recommendation
    Telegram WhatsApp Facebook VK LinkedIn
    亚洲成AV人片天堂网无码| 久久中文骚妇内射| 在线中文字幕视频| 精品无码AV一区二区三区不卡| 伊人热人久久中文字幕| 亚洲最大av无码网址| 日韩人妻无码中文字幕视频| 免费a级毛片无码a∨免费软件| 亚洲精品无码久久久| 潮喷无码正在播放| 亚洲A∨无码一区二区三区| 亚洲不卡无码av中文字幕| √天堂中文官网在线| 中文字幕 qvod| 无码AV大香线蕉| 国产日韩精品中文字无码| 无码日韩精品一区二区免费 | 内射人妻少妇无码一本一道| 亚洲精品无码鲁网中文电影| 少妇无码?V无码专区在线观看 | 亚洲精品无码成人片在线观看 | 欧洲精品久久久av无码电影| 成人午夜福利免费无码视频| 免费A级毛片无码无遮挡内射| 中文www新版资源在线| 一本加勒比HEZYO无码人妻| 精品久久久久久久久中文字幕| 中文字幕AV影片在线手机播放| 天堂在线最新版资源www中文| 无码人妻一区二区三区在线水卜樱 | 亚洲欧美成人久久综合中文网 | 亚洲国产精品无码久久九九 | 中文字幕无码免费久久| 中文字字幕在线中文乱码不卡| 中文字幕无码毛片免费看| 中文字幕无码乱人伦| 日本中文字幕免费高清视频| 最近中文字幕电影大全免费版| 最新中文字幕在线观看| 一区 二区 三区 中文字幕| 免费A级毛片无码A∨免费|