    Troubleshooting Guide for Slow Cooling Rate in High-Low Temperature Test Chambers

    Source:LINPIN Time:2025-09-06 Category:Industry News

    The high-low temperature test chamber is the cornerstone of environmental reliability testing. Its cooling rate dictates test duration and data validity. Field data from 500+ chambers over ten years show that “slow cooling” accounts for 38 % of all malfunctions, second only to “no cooling”. This paper, aligned with GB/T 2423.1 and IEC 60068-3-5, presents a systematic approach to diagnosing and correcting slow-cooling events for laboratories, metrology bodies and manufacturers.
    High-Low Temperature Test Chambers
    Technical Definition of Cooling Rate
    Nominal: empty chamber, +25 °C to –40 °C in ≤ 60 min (JB/T 9512 class A).
    Measured: 1 Hz sampling, average of five runs; deviation > +10 % is labelled “slow”.
    Boundary conditions: ambient 23 °C ± 2 °C, RH ≤ 65 %, empty, air speed 0.5 m s?1. Any deviation requires correction factor Kθ.
    Fault Tree and Weightings
    Top-level factors: condenser heat-transfer resistance, ambient coupling, refrigeration circuit, air-side flow, control strategy, load & set-point.
    Condenser fouling: 27 % of cases.
    Insufficient wall clearance or nearby heat sources: 19 %.
    Refrigerant micro-leaks, saturated dryer, expansion-valve drift: 22 %.
    Blower speed loss or duct leakage: 15 %.
    Conservative PID or faulty defrost logic: 9 %.
    Excessive specimen mass or aggressive set-point: 8 %.
    Step-by-Step Diagnosis and Quantification
    4.1 Condenser Resistance
    Measure air-temperature rise ΔT across coil; normal ≤ 8 K, fouled ≥ 12 K.
    Measure static-pressure difference ΔP; limit 15 Pa, cleaning required at 30 Pa.
    Cleaning: power-off, remove top panel, 0.3 MPa nitrogen blow, 40 °C neutral detergent spray, rinse, 110 °C dry, re-assemble. Expect ≥ 30 % reduction in ΔT.
    4.2 Ambient Coupling
    Air-cooled units need ≥ 0.6 m from walls, water-cooled ≥ 0.8 m; no ceiling obstruction within 1 m of exhaust.
    Ambient range 5–30 °C; every 1 °C above 30 °C lengthens pull-down time by 2.3 %.
    Keep ovens or furnaces behind a physical barrier; supply-air temperature must be within 3 K of room air.
    4.3 Refrigeration Circuit
    R404A at +25 °C ambient: high 1.5 ± 0.1 MPa, low 0.35 ± 0.05 MPa.
    High < 1.3 MPa plus low > 0.45 MPa and superheat > 12 K indicate under-charge.
    Leak detector sensitivity ≥ 1 g yr?1; annual loss > 1 % requires brazing repair.
    Dry-filter temperature difference ≤ 2 K; replace if > 4 K.
    Thermal-expansion-valve superheat 6–8 K; electronic valve step-loss < 0.5 %, otherwise replace driver.
    4.4 Air-Side Flow
    Evaporator face velocity 1.2 ± 0.2 m s?1 (five-point mean).
    If < 0.8 m s?1, check blower capacitor, ice or corrosion on impeller, torn flexible duct.
    Remedy: change capacitor, rebalance to G 6.3, seal ducts with high-temperature aluminium tape.
    4.5 Control Strategy
    Defrost initiates when evap. temp. < –25 °C for 40 min; if PID output < 20 % and defrost still triggers, controller misjudges load and reduces speed.
    Implement “rate lock-out”: if ΔT/Δt < 0.3 K min?1 for 10 min, defrost is inhibited. PID starting point for empty high-mass chamber: Kp = 1.8, Ki = 0.05, Kd = 0.2; reduce Ki by 30 % when 100 kg aluminium load is present. 4.6 Load & Set-Point Heat load Q = m c ΔT / t. 50 kg steel, c = 0.49 kJ kg?1 K?1, ΔT = 65 K, t = 1 h → Q = 0.44 kW (8.8 % of 5 kW capacity). If Q > 15 %, extend pre-cooling or use step set-points.
    Avoid aggressive over-shoot: target –40 °C, do not set –45 °C; instead set –35 °C, wait 10 min, then –40 °C.
    Thirty-Minute Field Checklist
    Minutes 0–5: verify ambient, wall distance, top exhaust.
    Minutes 6–10: read high & low pressure, evap. temp., current.
    Minutes 11–20: non-contact ΔT on condenser, velocity grid on evaporator.
    Minutes 21–25: inspect filters, capacitor, sight-glass.
    Minutes 26–30: log PID output, defrost state, load estimate.
    If all values normal yet pull-down > 110 % of nominal, label “hidden system mismatch” and schedule factory calorimeter test.
    Maintenance SOP & Intervals
    Condenser: daily blow-off, quarterly wash & dry, annual fin-thickness check—replace if < 90 % of original. Dry filter: replace yearly or when ΔP > 0.3 bar.
    Blower: visual daily, balance quarterly, grease bearing with 2 g Li-soap grease yearly.
    Refrigerant: annual leak test; after recharge run 4 h and analyse acid value < 0.1 mg KOH g?1.
    Controller: back-up parameters daily, calibrate sensors quarterly, update firmware and burn-in 72 h yearly.
    Closing Remarks
    Over ninety per cent of slow-cooling events stem from fouling, ambient issues or minor leaks. Apply the loop “boundary check – quantify – clean/repair – verify” and the chamber usually recovers within two hours. For the remaining ten per cent, factory-level calorimeter testing and model-based re-matching are required. Shift from “fail-and-fix” to “predict-and-prevent” by continuously monitoring discharge pressure, current and condenser ΔT; cloud analytics can issue an alert at a 5 % performance loss, cutting unplanned stops to below one per cent.

    News Recommendation
    During the operation of a temperature and humidity test chamber, some abnormal situations may occur, such as excessive overheating of the condenser tube.
    Improper operation of a formaldehyde test chamber may lead to equipment failure. To help users avoid operational errors, here are some important points to keep in mind when using the device.
    What is the purpose of the touchscreen temperature and humidity controller in a high-low temperature alternating humidity test chamber?
    The salt spray test chamber is essential for corrosion resistance testing of metal products, stone products, coatings, and more. However, without regular cleaning and maintenance, dust buildup, component wear, rust, and other issues can lead to equipment failure, disrupting production progress.
    When a company changes its production location and needs to relocate a thermal shock test chamber, the following precautions must be taken to minimize potential damage to the equipment.
    Product Recommendation
    Telegram WhatsApp Facebook VK LinkedIn
    精品欧洲av无码一区二区14 | 日韩高清在线中文字带字幕 | 亚洲午夜无码久久久久| 久久无码AV中文出轨人妻| 13小箩利洗澡无码视频网站免费| 最近中文字幕大全免费版在线| 亚洲AV无码一区二区二三区入口| 中文字幕二区三区| 777久久精品一区二区三区无码 | 中文午夜乱理片无码| 熟妇人妻中文字幕无码老熟妇| 国产在线精品无码二区| 亚洲性无码一区二区三区| 亚洲中文字幕成人在线| а天堂中文最新版在线| 亚洲AV无码一区二区一二区| 成人免费无码H在线观看不卡| 亚洲成a人片在线观看无码| 人妻丰满熟妇AV无码区HD| 人妻无码中文字幕免费视频蜜桃| 亚洲中文字幕无码久久精品1| 亚洲AV无码专区日韩| 无码人妻一区二区三区兔费| 一本色道无码道DVD在线观看| 熟妇人妻系列av无码一区二区| 最近2019年中文字幕一页| 精品久久久久中文字幕日本| 在线综合亚洲中文精品| 久久精品中文字幕一区| 亚洲AV无码一区二三区| 日本按摩高潮a级中文片| 亚洲欧美中文字幕高清在线| 高清无码中文字幕在线观看视频| 亚洲AV无码一区二三区| 夜夜精品无码一区二区三区| 中文字幕色AV一区二区三区 | 亚洲欧美日韩一区高清中文字幕| 亚洲开心婷婷中文字幕| 中文字幕一区在线观看视频| 中文字幕日韩第十页在线观看| 无码精品A∨在线观看免费|