    Sand and Dust Test Chamber – Code of Practice and Key Technical Details (Conforming to GB/T 2423.37, GB 4208, IEC 60529, ISO 20653, etc.)

    Source:LINPIN Time:2025-09-12 Category:Industry News

    A sand and dust test chamber is the core item of equipment used to simulate desert, arid and industrial high-dust environments. The quality of its operation directly determines a product’s IP protection rating, reliability life and market-access qualification. Based on the principles of “risk anticipation, process control and result traceability”, this paper systematically lists 27 key technical details covering everything from power-on preparation to shutdown and maintenance, providing laboratory staff, third-party inspection bodies and manufacturing engineers with practical, actionable guidance.
    sand and dust test chamber
    II. Systematic pre-use checks
    2.1 Electrical safety verification
    a) Rated supply: three-phase five-wire AC 380 V ±10 %, 50 Hz ±0.5 Hz; PE conductor impedance ≤ 4 Ω.
    b) Stabiliser: external AVC stabiliser (accuracy ≤ ±2 %) to prevent compressor or vibrator trip due to voltage sag.
    c) Insulation resistance: measure phase–earth and phase–phase with a 500 V megger; ≥ 20 MΩ cold, ≥ 5 MΩ hot.
    d) Residual-current device: type B RCD, 30 mA, trip time ≤ 100 ms, preventing micro-shorts caused by conductive dust films.
    2.2 Air supply and exhaust
    a) Compressed air: dew-point ≤ –40 °C, particles ≤ 0.1 μm, oil mist ≤ 0.1 mg/m3, pressure 0.5–0.7 MPa.
    b) Exhaust: φ110 mm port on chamber roof, connected to HEPA + bag filter in series; terminal velocity ≥ 15 m/s, ensuring dust concentration ≤ 0.15 mg/m3 at 2 m (meeting GB 16297 un-organised-emission limit).
    2.3 Talc pre-treatment
    a) Sieving: dry-sieved through 200 mesh (75 μm), residue ≤ 2 %.
    b) Drying: 105 °C ±2 °C for 4 h, moisture ≤ 0.5 %.
    c) Re-use limit: same batch used ≤ 20 cycles to prevent moisture absorption and agglomeration.
    III. Sample mounting and fixture design
    3.1 Load cross-section
    Total projected sample area ≤ 50 % of working-section area; any single direction ≤ 70 % to avoid bypass flow.
    3.2 Fixture material
    6061-T6 aluminium alloy or SUS304, anodised or brushed; no organic coatings that could shed and contaminate the dust.
    3.3 Earthing
    Fixture connected to chamber wall equipotential bond; earth resistance ≤ 1 Ω to prevent electrostatic dust attraction.
    IV. Parameter setting and calibration
    4.1 Temperature
    a) Set-points: 23 °C, 55 °C, 85 °C; calibrated with external Pt100 sensors (±0.15 °C) in 9-point grid per GB/T 5170.2.
    b) Heating rate: ≤ 1 °C/min to avoid instantaneous seal distortion.
    4.2 Dust concentration
    Laser turbidity meter (0–10 g/m3, linearity ±2 %), sampling 50 mm upwind of specimen; target 2 kg/m3 ±0.2 kg/m3, logged every 30 min; auto refill if drift > 5 %.
    4.3 Air velocity
    Vertical velocity 1.5 m/s ±0.2 m/s, calibrated with hot-wire anemometer at specimen geometric centre.
    4.4 Vibration motor
    Eccentricity 2 mm, 50 Hz, duty 5 s ON / 55 s OFF to keep the hopper clear yet avoid weld fatigue from continuous resonance.
    V. In-test monitoring
    5.1 Key sequence
    a) 0–5 min: soft-start fan → dust pre-circulation → concentration OK.
    b) 5 min–T: test dwell; log T, RH, concentration, velocity every 10 min.
    c) T–T+5 min: heating off, fan speed down, vibrator runs 2 min to clear dust.
    d) After T+5 min: main power off, open relief valve, wait 10 min before door opening.
    5.2 Abort criteria
    Stop immediately if:
    — chamber temperature deviates > ±3 °C;
    — dust concentration < 1.5 kg/m3 or > 2.5 kg/m3;
    — vibrator current > 120 % rated;
    — exhaust filter differential ≥ 1 500 Pa.
    VI. Test termination and sample recovery
    6.1 Settling
    Keep door closed 15 min after stop; allow airborne dust to settle until concentration ≤ 0.02 g/m3.
    6.2 Sample cleaning
    a) Work in negative-pressure bench; blow with 0.2 MPa oil-free nitrogen top-down; no brushes that could scratch.
    b) Gravimetric check: mass increase ≤ 10 mg deemed seal-tight.
    c) Functional check: after 2 h recovery at 23 °C ±2 °C, 45 %–55 % RH, re-test insulation, sealing, optical and electrical performance.
    VII. Cleaning and maintenance
    7.1 Daily
    — Vacuum chamber floor residues.
    — Wipe viewing window and seals with ethanol.
    — Check vibrator bolt torque (8.8 N·m).
    7.2 Weekly
    — Remove fan impeller, blow clean; replace any missing balance weights.
    — Calibrate dust sensor zero & span.
    — Drain compressor reservoir.
    7.3 Yearly
    — Replace HEPA and pre-filters.
    — Entrust accredited body to re-calibrate temperature, velocity, concentration.
    — Inspect contactors and relays; replace if outside tolerance.
    VIII. Personnel protection and environmental controls
    8.1 PPE
    KN95 mask, goggles, anti-static gloves; prolonged inhalation of talc may cause pneumoconiosis—limit exposure to 2 h per entry.
    8.2 Room conditions
    Ambient RH ≤ 65 % to prevent dust clumping; conductive floor with earth ≤ 10 Ω; 5 kg ammonium-phosphate extinguisher provided for electrical fires.
    IX. Documentation and traceability
    9.1 Raw records
    Include test order, pre-use checklist, calibration certificates, run curves, alarm screen shots, specimen photos (before & after).
    9.2 Data retention
    Electronic records ≥ 10 years, paper ≥ 3 years, ensuring traceability to every gramme of talc and every temperature fluctuation.
    The reliability of a sand and dust test chamber is “30 % hardware, 70 % operation”. Only by integrating electrical safety, dust characteristics, airflow organisation, sequence control and personnel protection into a standardised management system can measurement repeatability be kept within 3 %, providing solid technical backing for R&D, quality arbitration and international trade. Each laboratory should compile its own Sand and Dust Test Operating Instruction based on these clauses and its specific chamber model, and review its effectiveness annually for continuous improvement.

    News Recommendation
    High and low temperature test chambers simulate high or low temperatures to test the reliability of product performance.
    Formaldehyde VOC environmental test chamber, also known as formaldehyde emission testing chambers, are large-scale testing equipment primarily used to simulate standard climatic conditions for measuring the release of formaldehyde from indoor decoration and renovation materials.
    When conducting tests with a sand and dust test chamber, there are primarily three processes involved. Some clients may not be familiar with these processes during initial consultations. Today, we will introduce these three processes and their corresponding temperature and humidity requirements.
    The rain test chamber, as a specialized instrument designed to evaluate the waterproof performance of products, plays an indispensable role across various industries. From everyday essentials like mobile phones and flashlights to highly precise and reliable lighting systems and signaling devices in the aerospace sector, waterproof performance remains a critical aspect of product design and quality control.
    The UV aging test chamber is a device that simulates ultraviolet radiation and condensation climate environments by using fluorescent ultraviolet lamps as the light source.
    Product Recommendation
    Telegram WhatsApp Facebook VK LinkedIn
    国产在线观看无码免费视频| 欧美成人中文字幕在线看| 精品久久无码中文字幕| 熟妇人妻无码中文字幕| 久久久这里有精品中文字幕| 18禁网站免费无遮挡无码中文 | 日韩精品无码一区二区三区| 亚洲欧美日韩在线中文字幕| 国产真人无码作爱免费视频| 亚洲va中文字幕无码久久不卡| 99re只有精品8中文| 高清无码中文字幕在线观看视频| 蜜桃臀无码内射一区二区三区| 人妻无码中文字幕免费视频蜜桃| 亚洲高清中文字幕免费| 无码人妻少妇久久中文字幕 | 亚洲韩国精品无码一区二区三区 | 性无码专区一色吊丝中文字幕| 中文无码字慕在线观看| 成在线人免费无码高潮喷水| 亚洲A∨无码一区二区三区| 日韩精品无码人成视频手机| 天堂最新版中文网| 亚洲中久无码不卡永久在线观看| 国产无码一区二区在线| 国产成人精品无码一区二区| 免费无码VA一区二区三区| 欧洲Av无码放荡人妇网站| 无码久久精品国产亚洲Av影片 | 亚洲AV无码国产精品色午友在线| 欧美日韩国产中文精品字幕自在自线 | 无码的免费不卡毛片视频| 超清无码无卡中文字幕| 国产日韩精品中文字无码| 国产办公室秘书无码精品99| 欧洲人妻丰满av无码久久不卡 | 精品人妻大屁股白浆无码 | 无码精品一区二区三区在线 | 日韩精品中文字幕无码一区| 无码乱人伦一区二区亚洲一| 精品视频无码一区二区三区|