免费无码中文字幕A级毛片_人妻少妇久久中文字幕一区二区_亚洲乱码中文字幕综合_亚洲va中文字幕无码久久

Search for the product you are looking for
研發(fā)中心

News

Slide down

Technical Specification and Key Control Points for the Installation of Salt Fog Chambers (Applicable to the pre-deployment of precision environmental simulation test equipment)

Source:LINPIN Time:2025-09-13 Category:Industry News

The salt fog chamber is the core instrument for evaluating the corrosion resistance of materials and protective coatings. Its measurement repeatability and reproducibility are directly affected by installation quality. Any deviation during on-site deployment may introduce systematic errors over subsequent hundreds or even thousands of hours of continuous testing, leading to data drift, misjudgement of sample failure, and increased shutdown maintenance costs. Therefore, installation must be included in the “first-inspection” regime and managed under a three-level quality control protocol of “plan – verify – confirm”. Based on GB/T 10587, GB/T 2423.17, ASTM B117 and ISO 9227, and integrating technical manuals of major domestic manufacturers, this document systematically reviews the key control points during installation and provides executable technical guidance for laboratories, inspection bodies and production sites.
Salt Fog Chambers
II. Installation Environment Requirements
A. Space Layout
Site-selection principle: give priority to an independent environmental simulation room; if restricted, place the chamber inside the plant, away from vibration sources (presses, air compressors, large motors) and strong electromagnetic interference sources (high-frequency hardening machines, welding stations).
Floor load: the fully loaded mass of the equipment (including saturator, heating water tank, specimen racks and 50 L salt solution) is usually ≥ 300 kg. Ensure a static floor load ≥ 500 kg/m2 and level the floor with a spirit level; longitudinal and transverse levelness ≤ 0.5 mm/m.
Clearances:
Rear ≥ 600 mm for condenser heat dissipation, circuit maintenance and saturator water filling;
Left/right sides ≥ 400 mm to avoid thermal radiation affecting adjacent equipment;
Front door area ≥ 1 000 mm to allow specimen loading/unloading and nozzle maintenance.
Ventilation & sunshine: room air-exchange rate ≥ 6 ACH. When organic salt fog (CASS, ASS) tests are run, provide a corrosion-resistant exhaust hood. Direct sunlight on the cabinet is forbidden to prevent ageing of PVC, PPS and other polymer parts.
B. Ambient Parameters
Temperature: 15 °C – 30 °C; relative humidity: ≤ 75 %RH; atmospheric pressure: 86 kPa – 106 kPa; no flammable, explosive or corrosive gases; dust concentration ≤ 0.2 mg/m3.
III. Technical Specifications for Utility Interfaces
A. Power Supply System
Rated voltage: AC 220 V ± 10 % / 50 Hz or AC 380 V ± 10 % / three-phase five-wire system, exactly as indicated on the nameplate.
Protective earthing: independent PE conductor, yellow-green, cross-section ≥ 2.5 mm2; earth resistance ≤ 4 Ω.
Residual-current protection: 30 mA residual-current circuit-breaker, trip time ≤ 0.1 s, on a separate branch from the laboratory main switch to avoid nuisance tripping.
Voltage stabilisation & isolation: if mains variation > ± 10 %, add a 5 kVA on-line UPS or precision voltage regulator to prevent heater and PLC damage by over-voltage.
B. Compressed-Air System
Air quality: comply with ISO 8573-1:2010 class [2:4:2], i.e. solid particles ≤ 0.5 μm, oil content ≤ 0.1 mg/m3, pressure dew point ≤ 3 °C.
Supply pressure: stabilise at 0.7 MPa – 0.8 MPa before the chamber, then reduce to 0.1 MPa – 0.2 MPa by a two-stage regulator for the nozzle; during testing the pressure must not fall below 0.3 MPa (3 kgf/cm2).
Piping material: Φ 8 mm × 1 mm transparent PU tube or 316 L stainless-steel tube; galvanised steel is forbidden to prevent Zn2? contamination of the salt solution.
Quick couplings: PC8-02 self-locking type, rated 1.5 MPa, ≥ 500 connect/disconnect cycles, ensuring maintenance efficiency.
Continuous air supply: for test cycles > 72 h, provide a ≥ 100 L air receiver plus refrigerant dryer to avoid pressure pulsation caused by frequent compressor start/stop.
C. Water Supply System
Water quality: de-ionised or distilled water with conductivity ≤ 5 μS/cm must be used for the saturator, seal trough and heating tank; nozzle rinsing may use laboratory grade-2 water (GB/T 6682).
Pressure & flow: inlet 0.1 MPa – 0.3 MPa; automatic make-up line fitted with a 40 mesh Y-strainer and a non-return valve to prevent impurities and siphoning.
Tank capacity: external 20 L PE tank with level alarm and low-level automatic shutdown.
IV. Emission & Environmental Requirements
A. Drain Line
Material: acid/alkali-resistant PVC-U, OD 32 mm, wall 2.0 mm, solvent-cement joints.
Gradient: horizontal section ≥ 3 %; “negative slope” and U-traps are forbidden to prevent salt-solution back-flow.
End-of-line treatment: discharge into laboratory neutralisation pit; adjust pH to 6.5 – 8.5 with NaOH before entering factory sewer. If copper salt (CASS) is used, add a Na?S precipitation tank; Cu2? ≤ 0.5 mg/L before discharge.
B. Exhaust Line
Material: same as above, Φ 50 mm PVC-U, temperature ≤ 60 °C.
Routing: chamber top mist outlet → local exhaust hood → corrosion-resistant centrifugal fan → outdoor vertical stack; outlet ≥ 1 m above roof with weather-cap.
Back-flow prevention: horizontal section ≥ 2 % gradient, outdoor end lower than indoor; if necessary, fit a PVC non-return valve.
Mist recovery: a “salt-mist catcher” (multi-stage PP packing + demister pad) is recommended; collection efficiency ≥ 90 % to reduce NaCl particle corrosion of roof steelwork.
C. Sealing & Leak Test
All pipe joints use EPDM corrosion-resistant O-rings plus PVC solvent cement double seal. After installation, conduct a 15 kPa pressure-hold test; pressure drop ≤ 0.5 kPa in 10 min is acceptable.
V. On-Site Commissioning & Acceptance
A. No-Load Run
Temperature deviation: 35 °C ± 2 °C (neutral salt fog). Calibrate with a certified multi-point logger, nine-point layout; deviation ≤ ± 1 °C.
Salt-fog settlement: 80 cm2 funnel method, continuous spraying 24 h; average settlement 1.0 – 2.5 mL/h; four-point spread ≤ 0.4 mL/h.
Pressure stability: automatically record supply-pressure curve; fluctuation ≤ ± 0.01 MPa.
B. Loaded Run
Place standard steel panels (Q235, Ra ≤ 0.8 μm); after 48 h, corrosion grade ≥ grade 4 of GB/T 6461-2002, and difference between upper and lower samples ≤ 1 grade, proving spray uniformity.
C. Documentation
Commissioning report, earth-resistance record, water-quality certificate, leak-test record and training attendance sheet are filed and kept ≥ 6 years.
VI. Common Installation Defects & Corrective Actions
Defect: drain pipe laid horizontal without gradient, causing solution back-flow after shutdown and heater corrosion perforation.
Correction: dismantle horizontal section; re-route with ≥ 3 % gradient and add a transparent sight tube for inspection.
Defect: air compressor not fitted with refrigerant dryer; moist air causes frequent nozzle blockage.
Correction: add refrigerated dryer + fine filter; drain condensate weekly; replace nozzle with Si?N? ceramic to triple service life.
Defect: exhaust pipe passes directly through wall to outdoors without rain protection; rain water back-flow causes inner tank corrosion.
Correction: fit 45° elbow + weather-cap on outdoor end; add a drain tee at the lowest point for periodic manual discharge of condensate.
VII. Personnel Training & Maintenance Pre-Conditions
After installation, the manufacturer’s engineer shall train operators, maintenance staff and safety officers on site; 100 % pass in the assessment is required before hand-over.
Establish a three-level (daily, weekly, monthly) check list covering: water level, pressure, nozzles, O-rings, pipe leakage, earth continuity.
Spare-parts store: 2 nozzles, full set of EPDM O-rings, 5 m PU tube, 5 each of 2 A / 10 A fuses, ensuring fault response time ≤ 4 h.
VIII. Conclusion
Installation quality is the first gateway to guaranteeing the metrological characteristics and service life of a salt fog chamber. Strictly following the four control modules of space layout, utilities, emission & environment, and commissioning & acceptance, supplemented by full-process records and risk-prevention thinking, can reduce the potential failure rate by more than 70 % and provide a stable, reliable and traceable test environment for subsequent material corrosion evaluation. It is hoped that every laboratory and on-site engineer will use this specification as a blueprint, refine the work instruction in line with actual conditions, and achieve the goal of “well installed, accurately measured, long-lasting”.

News Recommendation
Recently, the on-site acceptance meeting for the thermal vacuum chamber project of a certain aerospace unit was successfully held in Tianjin. Representatives from Shanghai Linpin Instrument Co., Ltd. and the owner, a certain aerospace unit in Tianjin, attended the meeting.
When a company changes its production location and needs to relocate a thermal shock test chamber, the following precautions must be taken to minimize potential damage to the equipment.
The constant temperature and humidity test chamber is widely used in many industries. To reduce the failure rate and accident rate during use
One of Linpin's standout products, the high-low temperature test chamber, excels with its impressive heating rate (1.0~3.0℃/min), cooling rate (0.7~1.0℃/min), and thoughtful multi-segment temperature range settings (A: -20℃ to 150℃; B: -40℃ to 150℃; C: -60℃ to 150℃; D: -70℃ to 150℃).
Rain test chambers are now widely used across various industries. When operating this equipment, staff should be familiar with essential knowledge, such as the necessary pre-use inspections. Let’s go through them today.
Product Recommendation
Telegram WhatsApp Facebook VK LinkedIn
免费无码中文字幕A级毛片_人妻少妇久久中文字幕一区二区_亚洲乱码中文字幕综合_亚洲va中文字幕无码久久
<abbr id="00ggy"><source id="00ggy"></source></abbr>
  • 
    
    <strike id="00ggy"></strike>
  • <bdo id="00ggy"></bdo>
  • <li id="00ggy"><source id="00ggy"></source></li>
  • <li id="00ggy"><source id="00ggy"></source></li>
    一级做a爱视频| aⅴ在线免费观看| 欧美黑人在线观看| 欧美精品99久久| 想看黄色一级片| 免费av观看网址| 免费观看黄色的网站| 日韩中文字幕组| 少妇人妻大乳在线视频| 色婷婷一区二区三区在线观看| 欧美国产日韩在线播放| 影音先锋成人资源网站| 亚洲欧美久久久久| 黄色av免费在线播放| 亚洲国产成人精品无码区99| 永久av免费在线观看| 天天摸天天舔天天操| 国模杨依粉嫩蝴蝶150p| 免费看污污视频| 日韩av片免费观看| 九九九九九国产| 在线观看免费污视频| 国产午夜福利100集发布| 精品一区二区成人免费视频| 久久久精品视频国产| 天堂av8在线| 欧美三级理论片| 91制片厂毛片| av在线网址导航| 另类小说第一页| www.xxx亚洲| 欧美视频第一区| 又大又硬又爽免费视频| 成人在线免费高清视频| 91视频福利网| 国产卡一卡二在线| 韩国一区二区在线播放| 天天久久综合网| 国产精品中文久久久久久| 欧美精品性生活| 天天操天天摸天天爽| 中文字幕无码不卡免费视频| 青青青在线视频免费观看| 天天影视综合色| 成人亚洲精品777777大片| 在线观看高清免费视频| 中文字幕 91| 人人干人人视频| 911av视频| aaaaaaaa毛片| 国产精品成人久久电影| 人妻夜夜添夜夜无码av| aaaaaa亚洲| 国产aaaaa毛片| 午夜不卡福利视频| 波多野结衣激情| 轻点好疼好大好爽视频| 国产精品va无码一区二区| jizzjizzxxxx| 欧美婷婷精品激情| 天天综合中文字幕| 国产九色porny| www国产黄色| 一区二区成人网| 最近免费观看高清韩国日本大全| 日本阿v视频在线观看| 色欲色香天天天综合网www| 浮妇高潮喷白浆视频| 韩国一区二区av| 第四色婷婷基地| 亚洲区成人777777精品| 精品一卡二卡三卡| 欧美激情第3页| 樱空桃在线播放| 欧美深夜福利视频| 午夜免费福利在线| 97超碰在线视| 国产欧美在线一区| 欧美日韩一级在线| 欧美国产亚洲一区| 一本之道在线视频| 国产 欧美 日韩 一区| 免费在线观看毛片网站| 中文字幕在线视频精品| 99久久国产综合精品五月天喷水| the porn av| 天天爱天天做天天操| 日日碰狠狠躁久久躁婷婷| 波多野结衣在线免费观看| 91国视频在线| 在线观看av免费观看| 青娱乐自拍偷拍| 人人爽人人爽av| 国产又黄又大又粗视频| 丰满女人性猛交| 亚洲不卡视频在线| 日本中文字幕在线不卡| 久久精品网站视频| 日韩xxxx视频| 中国老女人av| 亚洲另类第一页| 91看片就是不一样| 波多野结衣之无限发射| 北条麻妃亚洲一区| 天天爱天天操天天干| 免费观看日韩毛片| 美国av在线播放| 亚洲黄色片免费| 在线免费av播放| 欧美私人情侣网站| 欧美精品久久久久久久久久久| 亚洲免费成人在线视频| 9久久婷婷国产综合精品性色 | 天天色综合天天色| 18禁免费无码无遮挡不卡网站| 97av中文字幕| 91社在线播放| 欧美精品色视频| 免费裸体美女网站| 色哺乳xxxxhd奶水米仓惠香| 亚洲精品视频三区| 性生活免费在线观看| 丁香婷婷激情网| 免费午夜视频在线观看| 久久久999免费视频| heyzo亚洲| 国产精品333| 免费成人在线视频网站| 国产96在线 | 亚洲| 国产色一区二区三区| 国产色一区二区三区| 色欲色香天天天综合网www| 日韩精品在线观看av| 91免费黄视频| 无码专区aaaaaa免费视频| 亚洲精品无码国产| 成人性生活视频免费看| www.国产在线视频| 国产精品12345| 少妇无码av无码专区在线观看 | 一级片视频免费观看| www.激情小说.com| 亚洲va在线va天堂va偷拍| 91性高潮久久久久久久| dy888午夜| 九九热只有这里有精品| 欧美 日本 亚洲| 超碰影院在线观看| www.久久91| 日本xxx免费| 免费看日本毛片| 成人亚洲视频在线观看| 国产野外作爱视频播放| 毛片毛片毛片毛| 亚洲精品午夜在线观看| 成年人黄色在线观看| 免费看日b视频| 18禁男女爽爽爽午夜网站免费| 91蝌蚪视频在线观看| 91热视频在线观看| 国产aaa一级片| 亚洲欧美一区二区三区不卡| 美女一区二区三区视频| 久久精品影视大全| 99re精彩视频| 免费观看黄色大片| 国产传媒久久久| 亚洲熟妇av日韩熟妇在线| 午夜视频在线瓜伦| 婷婷激情小说网| 日韩精品一区在线视频| 91av在线免费播放| 亚洲免费成人在线视频| 久无码久无码av无码| 热久久精品免费视频| 日本一二三四区视频| www.日本在线播放| 三上悠亚在线一区二区| 黄色网在线视频| 爱情岛论坛成人| 伊人再见免费在线观看高清版| 免费超爽大片黄| 九九热精品在线播放| 男人天堂网站在线| 国产精品人人妻人人爽人人牛| 激情文学亚洲色图| 黄色一级视频片| 97超碰人人看| 99精品免费在线观看| 男女激烈动态图| 宅男噜噜噜66国产免费观看| 精品国产无码在线| 老熟妇仑乱视频一区二区| 桥本有菜av在线| 欧美国产日韩在线播放| 成年丰满熟妇午夜免费视频| 欧洲黄色一级视频| 91午夜在线观看| 日韩av自拍偷拍| 国产不卡一区二区视频|