<abbr id="00ggy"><source id="00ggy"></source></abbr>
  • 
    
    <strike id="00ggy"></strike>
  • <bdo id="00ggy"></bdo>
  • <li id="00ggy"><source id="00ggy"></source></li>
  • <li id="00ggy"><source id="00ggy"></source></li>
    Search for the product you are looking for
    研發中心

    News

    Slide down

    ?Comprehensive Analysis of Key Precautions for Using Rain Test Chambers: Five Critical Points to Ensure Accurate Testing?

    Source:LINPIN Time:2025-08-15 Category:Industry News

    To guarantee reliable and precise test results from rain test chambers, it is essential to strictly adhere to the following precautions during operation. Below, we detail the core elements of the entire equipment usage process, helping you efficiently complete testing tasks.

    ?1. Pre-test Preparations: The Devil is in the Details?

    ?Equipment Inspection?: Before starting, conduct a comprehensive check of the device components and accessories. Focus on confirming that there are no debris residues in the water tank and that the water level has reached the standard mark.
    ?Water Quality Requirements?: The test water must be purified water or filtered water to avoid equipment blockages or testing inaccuracies caused by poor water quality.
    ?Sample Fixation?: Place the test sample steadily inside the chamber, ensuring it is securely fixed without any looseness to prevent displacement during the test.
    ?Valve Operation?: After closing the drain valve, adjust the flow control valve to its maximum opening to prepare for subsequent pressure regulation.
    ?Pressure Pump Venting?: When using the pressure pump for the first time, vent the internal air. Observe the water flow through the vent until it stabilizes, then close the cap to complete the venting operation.

    rain test chambers
    ?2. Test Duration Setting: The Core of Precise Control?

    After connecting the power supply, set the operating time according to test requirements. Note the following:

    The time setting range is 0~100 hours. Setting it to 0 will prevent the device from starting.
    The device will automatically stop upon reaching the preset time, or it can be manually terminated by pressing the stop button.
    ?3. Flow Rate Adjustment: Dynamic Adaptation to Testing Needs?

    After starting the device, continuously adjust the control valve to stabilize the red float ball of the flow meter at the target flow rate mark, ensuring that the test conditions meet standard requirements.

    ?4. In-operation Monitoring: Safety Precautions and Operational Norms?

    ?Pump Protection?: Never start the pump without water, as this will lead to motor burnout or pipe rupture.
    ?Nozzle Stabilization?: The nozzle must be kept stable using a fixing device or manual holding to prevent nozzle oscillation caused by high-pressure water flow.
    ?5. Post-test Handling: Dual Maintenance of Data and Equipment?

    ?Data Analysis?: After the test, turn off the power supply and analyze the test piece’s performance parameters using professional software.
    ?Equipment Cleaning?: Thoroughly remove debris inside and outside the chamber, and inspect each component for abnormal wear or leakage.
    ?Maintenance Records?: Establish an equipment usage log to record test parameters and equipment status, providing a basis for subsequent maintenance.
    ?Summary and Recommendations?

    Mastering the above five critical points not only enhances testing efficiency but also extends the service life of the equipment. If you are interested in advanced applications or industry-specific solutions for rain test chambers, welcome to continue following updates on our platform. In case of any abnormalities during operation, it is recommended to immediately stop the device and contact professional technicians for handling to ensure testing safety and result reliability.

    News Recommendation
    The technical indicators of a high-low temperature test chamber have a systematic and multi-dimensional impact on experimental results. The core lies in whether it can accurately simulate the target environmental conditions and maintain controllability throughout the experimental process.
    To ensure the accuracy of the rain test chamber results, the correct operation of the equipment is essential. So, how should the device be operated? What details need attention during the operation process?
    The temperature shock test chamber, also known as a thermal shock test chamber or high-low temperature impact test chamber, is a device used to simulate extreme temperature variations under controlled environmental conditions.
    Cold and hot shock test chambers utilize high-temperature and low-temperature zones during testing.
    High and low temperature test chambers are designed to simulate natural climatic conditions to test the high- and low-temperature endurance of products or materials under alternating temperature changes.
    Product Recommendation
    Telegram WhatsApp Facebook VK LinkedIn
    亚洲AV无码乱码在线观看富二代| 永久免费无码网站在线观看个| 亚洲?V无码乱码国产精品| 乱人伦中文视频高清视频| 99国产精品无码| 永久免费av无码入口国语片| 中文在线资源天堂WWW| 精品久久久久久久无码| 中文字幕亚洲一区二区va在线| 久久中文字幕人妻熟av女| YW尤物AV无码国产在线观看| 免费无码作爱视频| 日本中文字幕高清| 久久精品亚洲乱码伦伦中文| 精品高潮呻吟99av无码视频 | 人妻无码中文字幕免费视频蜜桃| 久久久无码精品亚洲日韩软件| 亚洲国产综合无码一区| 台湾无码AV一区二区三区| 久久中文骚妇内射| 一二三四社区在线中文视频| 无码AV大香线蕉| 少妇无码太爽了不卡视频在线看| 超清无码一区二区三区| 精品无码久久久久久尤物| 亚洲VA成无码人在线观看天堂| 人妻AV中出无码内射| 无码国产精品一区二区免费虚拟VR | 最好的中文字幕视频2019 | 婷婷中文娱乐网开心| 狠狠躁天天躁无码中文字幕| а中文在线天堂| 日韩欧群交P片内射中文| 中文字幕乱码人妻一区二区三区 | 亚洲无码黄色网址| 亚洲成A人片在线观看无码3D| 亚洲av无码天堂一区二区三区 | 亚洲乳大丰满中文字幕| 日韩精品无码一区二区中文字幕| 久久久久久久人妻无码中文字幕爆| 久久亚洲精品中文字幕|