Safe and Precise Operation Technical Specifications and Risk Prevention & Control System for High and Low Temperature Alternating Test Chambers

Source:LINPIN Time:2025-11-20 Category:Industry News

As a core piece of equipment in the field of environmental reliability testing, high and low temperature alternating test chambers play an irreplaceable role in the quality verification processes for electronic components, aerospace materials, automotive parts, chemical products, and other industries. However, during practical application, some operators often neglect several critical operational details due to insufficient understanding of the equipment’s operational mechanisms or inadequate safety awareness. These seemingly trivial aspects actually pose potential risks to the accuracy of test data, operational stability of the equipment, and personnel safety. To ensure efficient testing processes, precise test results, and a safe working environment, the following systematic elaboration on standardized operating procedures and risk prevention and control points for high and low temperature alternating test chambers is hereby presented, aiming to provide technical support for laboratory standardization management.

1. Electrical Safety Protection and Reliability Management of Grounding Systems
During initial equipment installation and positioning, strict implementation of chassis grounding protection measures is mandatory. This requirement is based on fundamental electrical safety standards, aiming to establish a reliable fault current discharge path to prevent electric shock accidents caused by damaged power cord insulation, internal component leakage, or induced voltage accumulation. The grounding resistance value must be periodically tested using a professional grounding resistance tester to ensure it is no greater than 4 ohms, complying with GB 4793.1 Safety Requirements for Electrical Equipment for Measurement, Control, and Laboratory Use. The grounding conductor should be a yellow-green dual-color copper core cable with a cross-sectional area of no less than 2.5mm2, and must be securely connected to the laboratory’s independent grounding network; series grounding or virtual connection is prohibited. Neglecting this requirement may cause the equipment chassis to become energized, posing a fatal threat to operators, while also easily causing control system signal interference and resulting in temperature control deviation.
2. Prohibited Operations for Chamber Door Opening/Closing and Temperature Field Stability Mechanisms
During equipment operation of heating and cooling programs, non-essential opening of the test chamber door is strictly prohibited. Opening the door will directly cause violent convection of cold and hot air between the workspace and external environment, destroying the established uniform temperature field distribution and causing local temperature fluctuations exceeding ±5℃, severely affecting test condition stability. More critically, opening the door under high-temperature conditions may cause hot air surges, leading to facial and hand burns for operators; opening under low-temperature conditions will allow large amounts of moist hot air to intrude, quickly frosting the evaporator surface, blocking air channels, reducing heat exchange efficiency, and even causing compressor liquid slugging damage. If opening the door is indeed necessary for observing sample status, this should be done through the observation window; if opening is mandatory, it should be performed when the test chamber is in the normal temperature range (25±5℃) and in a stopped state, with the opening angle not exceeding 30° and duration controlled within 15 seconds.
3. Start-Stop Interval Control for Refrigeration Systems and Compressor Protection Strategies
When the refrigeration unit has been shut down for a short period of 15 minutes, immediate restart is strictly prohibited. This restriction stems from the pressure balance requirements and lubricating oil return mechanism inside the compressor. At the moment of shutdown, the high-pressure side pressure of the system can still reach over 1.5 MPa, while the low-pressure side is in a vacuum state. Forced starting will cause the motor load torque to exceed the rated value by more than 300%, leading to overheating burnout of windings or breakdown of starting capacitors. Simultaneously, a compressor without sufficient oil return may cause lubrication failure of moving parts, accelerating mechanical wear. The correct operational specification is: after shutdown, wait at least 20-30 minutes for the high-low pressure differential to naturally balance and lubricating oil to fully return to the crankcase before restarting. For equipment equipped with intelligent controllers, the system has a built-in delay protection of 3-5 minutes. Manual operations should avoid frequent switching, with daily start-stop cycles not exceeding 6 times.
4. Principle of Independent Power Configuration for High Heat-Generating Samples
If the total heat-generating power of loaded samples exceeds the heat load limit corresponding to the workspace volume (typically calculated as 50W/L), an external independent power supply must be used; direct use of internal equipment sockets is strictly prohibited. The internal power circuit design only bears conventional signal transmission and low-power drive loads, with its rated current generally not exceeding 5A. Connection of high-current loads will cause internal circuit overload heating, accelerated insulation layer aging, and even short-circuit fires. When configuring independent power supplies, ensure the power supply line capacity matches, recommend using cables with a cross-sectional area of no less than 1.5mm2, and install independent leakage protection circuit breakers. Sample power cables and equipment control cables should be routed separately, maintaining a distance of more than 10cm to avoid electromagnetic interference affecting temperature sensor signal accuracy.
5. Restrictions on Chamber Door Opening During High-Low Temperature Transition
When executing test profiles transitioning from high to low temperature, chamber door opening time must be strictly controlled to the minimum. After the high-temperature phase, the workspace temperature may reach over 150℃. Rashly opening the door at this time will not only cause the sample to suffer unexpected thermal shock but also generate severe temperature gradients and dew point changes inside the chamber. Moisture-laden hot air rapidly condenses upon encountering cold, forming large amounts of water droplets on air duct panels, sensor sheaths, and sealing strips; this moisture may freeze and expand during subsequent low-temperature phases, causing structural component deformation, rupture of platinum resistance sensor encapsulation, or seal failure. Standard operation requires: if sample adjustment is needed during the holding platform after the heating phase, wait until temperature drops below 60℃ before opening the door, with opening time not exceeding 10 seconds, while quickly wiping visible condensation with absorbent paper.
6. Periodic Verification Mechanism for Safety Protection Devices
The built-in circuit breaker and over-temperature protector are the final defense lines for safeguarding samples and personnel, requiring a regular inspection mechanism. Circuit breakers should undergo breaking capacity testing monthly, using specialized testers to simulate short-circuit currents, verifying whether they can remain non-tripping within 1 hour at 1.13 times rated current and reliably trip within 1 hour at 1.45 times rated current. Over-temperature protectors (typically bimetallic or electronic temperature switches) must be calibrated quarterly using standard temperature sources, with set-point deviation not exceeding ±2℃. During calibration, the main control circuit should be disconnected, and the protector probe placed together with a standard thermocouple in the temperature field to record its action temperature value. If protection device failure is detected, equipment must be immediately stopped and replaced with original certified spare parts; shielding or short-circuiting protection loops for non-compliant operations is strictly prohibited.
7. Energy Consumption Management and Heat Load Control for Lighting Systems
The built-in lighting device of the test chamber should be turned off promptly after sample loading is completed. Although lighting fixtures have relatively low power (typically 15-25W), their cumulative heat generation effect cannot be ignored. Under -40℃ low-temperature conditions, the radiant heat from a single fixture can raise local area temperature by 2-3℃, compromising temperature uniformity indicators. Meanwhile, prolonged operation of lighting accelerates lamp lumen depreciation, shortens service life, and increases unnecessary energy consumption. Modern equipment mostly adopts LED cold light sources, but it remains recommended to keep them off when not necessary. An intelligent mode can be set through the controller: “turn on when door opens, automatically turn off after 30 seconds when door closes,” achieving a balance between energy saving and convenience.
8. Dehumidification Pre-treatment Procedure Before Low-Temperature Testing
Before implementing sub-freezing temperature testing, thorough drying treatment of the workspace interior is mandatory. Residual moisture will solidify into ice crystals under low-temperature environments, potentially blocking air circulation channels, freezing and swelling sample rack fixing structures. More seriously, when moisture penetrates temperature sensor sheaths or equipment gaps, the mechanical stress from freezing expansion can reach over 200 MPa, sufficient to destroy the ceramic framework of PT100 platinum resistance sensors or cause seal ring cracking. The standard dehumidification procedure is: at room temperature, open the chamber door for ventilation for 30 minutes, use clean non-woven fabric to wipe the inner walls, air deflectors, and sample racks; then start the equipment and operate at 80℃ for 1 hour for baking dehumidification, only transferring to the low-temperature program after humidity drops below 10%RH. For extremely low-temperature tests (below -70℃), it is recommended to additionally place silica gel desiccant and install a vacuum drying interface.
9. Heat Balance Waiting Requirements After Test Completion
After the test program terminates, immediate opening of the workspace door is strictly prohibited. The internal temperature may still be in an extreme state (high temperature reaching 180℃ or low temperature reaching -70℃). Immediate door opening will cause violent air convection and heat exchange. Under high-temperature conditions, the outflowing air stream temperature can exceed 100℃, far beyond human tolerance limits, causing second-degree burns within 2 seconds of contact; under low-temperature conditions, instantaneous vaporization of cold air may cause rapid dew point drop in the local micro-environment, frosting the sample surface and affecting subsequent measurement accuracy. The correct practice is: wait for the equipment to naturally return to below 60℃ (after high-temperature tests) or above -10℃ (after low-temperature tests), or execute a “return to normal temperature” program through the controller. Only when the temperature approaches ambient temperature and the pressure balance indicator lights up can the chamber door be opened. This process typically requires 30-60 minutes, depending on the set temperature extreme and workspace volume.
10. Personal Protection Standards for High-Temperature Sample Removal
When retrieving samples from equipment that has just completed high-temperature testing, thermal protective gloves conforming to GB 24541 Hand Protection – Protective Gloves Against Chemicals and Micro-Organisms must be worn. Sample surface temperatures may remain consistent with set values; for example, a sample at 150℃ can still maintain over 120℃ for 5 minutes, and direct contact will cause severe burns. It is recommended to use aramid fiber or asbestos-coated thermal insulation gloves with a Contact Heat Protection Performance Index (HTI) greater than 24, ensuring at least 15 seconds of protection when contacting objects at 300℃. Sample retrieval actions should be swift and accurate, assisted by specialized high-temperature-resistant fixtures. After removal, samples should be immediately placed on ceramic fiber insulation pads with warning signs set up. It is advisable to equip the retrieval area with emergency shower facilities and develop burn emergency response plans to ensure immediate handling when incidents occur.
11. Influence Mechanism of Sample Loading Layout on Temperature Field Uniformity
Test sample placement should follow the principle of uniform distribution, occupying 1/3 to 2/3 of the workspace effective volume, while ensuring unobstructed air circulation channels. Overly dense stacking will obstruct airflow organization, reducing local wind speed to below 0.5m/s, causing temperature change rates to decrease by over 40% and generating temperature gradients exceeding ±5℃, failing to meet the uniformity requirements specified in GB/T 2423.1 standard. Samples should maintain at least 5cm spacing between them, and no less than 10cm distance from inner walls; the areas of air outlet and return openings must not be blocked. For irregular-shaped samples, use hollowed sample racks and adjust placement angles to avoid forming eddy dead zones. The total load mass is recommended not to exceed 80% of the equipment’s nominal capacity to prevent overload wear of transmission components.
12. Risks of Live Operation of Communication Interfaces and ESD Protection Procedures
When connecting equipment to computers for program setting or data acquisition, physical interface connection must be completed in a powered-off state. Live insertion/removal of DB9 serial ports or RJ45 network ports may generate induced voltage of dozens of volts, breaking down the CMOS circuits of controller communication chips, causing communication interruption, data loss, or even motherboard damage. Interface circuits generally lack hot-swap protection design, and electrostatic discharge (ESD) constitutes the primary threat. The standard procedure is: first turn off the main equipment power and wait 5 minutes for capacitor discharge, then turn off the computer power, followed by cable connection, and finally power on sequentially. Anti-static wrist straps should be worn during connection, with interface screws tightened to avoid signal fluctuations caused by poor contact. It is recommended to use opto-isolated communication modules to electrically isolate the communication loop from the main control loop, enhancing anti-interference capability.
13. Energy Management and Electrical Safety Protection During Equipment Idle Periods
After test tasks are completed, the equipment’s main power switch should be completely turned off, not just the stop button on the operation panel. Equipment standby status still consumes 30-50W power, with control systems and sensors remaining energized, wasting energy and increasing lightning surge damage risk. Cutting off the main power can prevent damage to precision components from abnormal nighttime power grid voltage fluctuations and reduce electrical fire probability. The shutdown procedure should be: first execute normal shutdown process through the controller, wait for the compressor and fan to completely stop operating, then disconnect the main power circuit breaker, and finally turn off the laboratory distribution box branch switch. For long-term deactivation (exceeding 7 days), it is recommended to unplug the power cord and place desiccant packs inside the control cabinet to prevent moisture侵蝕 circuit boards. Before reactivation, insulation resistance testing must be performed to ensure it is not less than 2MΩ.
Comprehensive Management System Construction and Continuous Improvement Mechanisms
In summary, the safe and precise use of high and low temperature alternating test chambers is a systematic engineering project involving multiple dimensions including electrical safety, thermal control, mechanical protection, and personnel behavior norms. Laboratory managers should incorporate the aforementioned points into Standard Operating Procedures (SOP), organize quarterly refresher training for operators, and strengthen execution supervision through video monitoring and data auditing. Only by internalizing normative awareness and externalizing it in actions can the equipment’s performance potential be fully realized, ensuring high-quality test data output, while constructing solid safety protection barriers for personnel and equipment, achieving long-term stable and efficient laboratory operations. For abnormal situations not covered in the procedures, a rapid response channel should be established to promptly contact the equipment manufacturer’s technical support team, avoiding problem escalation caused by blind handling.

News Recommendation
The sand and dust test chamber is used to evaluate the sealing performance of factory-produced products by simulating the erosion caused by natural wind and sand climates.
Low-temperature test chambers are primarily used to evaluate the storage capabilities and environmental adaptability of products and materials from industries such as electronics, electrical engineering, automotive, and home appliances under extremely low-temperature climatic conditions.
The salt spray test chamber currently has four types of testing methods.
Chongqing Chuanyi Microcircuit Co., Ltd. (referred to as Chuanyi Micro) was established in 2002 and is a state-owned enterprise under the China Four United Group.
Thermal vacuum testing is a type of test that verifies the performance and functionality of spacecraft and its components under vacuum and specific temperature conditions.
Product Recommendation
Telegram WhatsApp Facebook VK LinkedIn
免费无码中文字幕A级毛片_人妻少妇久久中文字幕一区二区_亚洲乱码中文字幕综合_亚洲va中文字幕无码久久
<abbr id="00ggy"><source id="00ggy"></source></abbr>
  • 
    
    <strike id="00ggy"></strike>
  • <bdo id="00ggy"></bdo>
  • <li id="00ggy"><source id="00ggy"></source></li>
  • <li id="00ggy"><source id="00ggy"></source></li>
    国产视频一视频二| 亚洲天堂av一区二区三区| 中国黄色片免费看| 三级在线免费观看| 黄色片视频在线播放| 51xx午夜影福利| 久久久精品三级| 日韩一级性生活片| 91福利免费观看| 成人黄色片视频| 国产一级大片免费看| www.久久久精品| 99精品人妻少妇一区二区| 少妇熟女一区二区| 人妻无码视频一区二区三区| 成人免费a级片| 久久精品一卡二卡| 超碰在线人人爱| 久久久久久久久久久视频| 看一级黄色录像| 蜜臀av免费观看| 色综合av综合无码综合网站| 成人免费看片'免费看| 日韩av片免费观看| 中文字幕第21页| 欧美韩国日本在线| 免费网站永久免费观看| 97超碰人人爱| 一区二区久久精品| 国产wwwxx| 精品久久久久av| 欧洲黄色一级视频| 400部精品国偷自产在线观看| 我看黄色一级片| 国产成人久久婷婷精品流白浆| 成人免费在线网| 日韩视频 中文字幕| 99中文字幕在线| 欧美在线aaa| 污色网站在线观看| 性欧美极品xxxx欧美一区二区| 少妇人妻在线视频| 男的插女的下面视频| 欧美极品少妇无套实战| 国产香蕉一区二区三区| 欧美三级午夜理伦三级老人| 亚洲第一精品区| 日韩a一级欧美一级| 久久成年人网站| 久久久精品高清| 黄色av网址在线播放| 欧美另类videos| 欧美黄色免费网址| 日本a在线天堂| 无码熟妇人妻av在线电影| 黄色网在线视频| 日韩久久久久久久久久久久| 亚洲熟妇无码av在线播放| 男人天堂成人网| 成年人视频大全| 超碰成人免费在线| 欧美午夜性视频| 116极品美女午夜一级| 50路60路老熟妇啪啪| av网站在线不卡| 九九九九九九九九| 色一情一乱一乱一区91| 国产专区在线视频| 免费av手机在线观看| 黄色片一级视频| 三级在线视频观看| 日本高清免费在线视频| 亚洲精品国产久| 久久视频免费在线| 色欲色香天天天综合网www| 少妇高潮喷水久久久久久久久久| 91av在线免费播放| 亚洲最大天堂网| 亚洲爆乳无码精品aaa片蜜桃| 青青草精品视频在线| 久草青青在线观看| 久热在线视频观看| 先锋影音男人资源| 国产91在线免费| 亚洲精品性视频| 蜜桃网站在线观看| 男人插女人视频在线观看| 十八禁视频网站在线观看| 久久综合在线观看| 欧美成人精品免费| 日韩一级理论片| 精品人妻人人做人人爽| 久久午夜夜伦鲁鲁一区二区| 91日韩精品视频| 黄色免费观看视频网站| 久久久精品高清| 黄色一级视频在线播放| 一区二区三区网址| 黄色成人在线免费观看| 日韩av播放器| 在线观看18视频网站| 免费毛片小视频| 奇米777在线视频| 97国产在线播放| 在线播放 亚洲| 天天摸天天碰天天添| 亚洲制服在线观看| 免费无码av片在线观看| 日本xxxxx18| 中文字幕av专区| 日韩日韩日韩日韩日韩| 午夜啪啪小视频| 欧美视频在线播放一区| 四虎1515hh.com| 成人观看免费完整观看| 在线观看三级网站| 色婷婷成人在线| 日韩中字在线观看| 国产系列第一页| 蜜桃免费在线视频| 国产深夜男女无套内射| 一本之道在线视频| 少妇黄色一级片| 久久久久久久久久久99| 婷婷视频在线播放| 一区二区在线播放视频| 久久在线中文字幕| 日本黄色播放器| av磁力番号网| a级片一区二区| 欧美三级午夜理伦三级富婆| 久久久久久久9| 精品国产乱码久久久久久1区二区| 欧洲av无码放荡人妇网站| 日本精品福利视频| 中文av字幕在线观看| 熟妇人妻无乱码中文字幕真矢织江| 男人日女人的bb| 在线视频观看91| 亚洲成人福利在线| 狠狠热免费视频| 久久久久久久久久久久久国产精品| www.九色.com| av动漫在线播放| 丰满人妻一区二区三区53号| 一区二区三区四区毛片| 国产野外作爱视频播放| 成年网站在线免费观看| 五十路熟女丰满大屁股| 欧美人与动牲交xxxxbbbb| 亚洲国产欧美91| 日本一本在线视频| 亚洲一区二区福利视频| 中文字幕av不卡在线| 亚洲激情在线观看视频| 久久婷婷国产精品| 人妻有码中文字幕| 免费观看精品视频| 成年人视频观看| av网站在线观看不卡| 116极品美女午夜一级| 国产91对白刺激露脸在线观看| 日本福利视频在线| 黄色影院一级片| 黄色国产精品视频| 男人搞女人网站| 黄色三级视频在线| 在线观看国产一级片| 91九色丨porny丨国产jk| 国产精品第157页| 日韩国产一级片| 欧美日韩在线一| 那种视频在线观看| 最新中文字幕2018| 潘金莲激情呻吟欲求不满视频| 福利片一区二区三区| youjizz.com亚洲| 高清无码视频直接看| 国产精品12345| 成人三级视频在线播放| 亚洲 欧美 另类人妖| 国产美女18xxxx免费视频| 国产黑丝在线视频| 91黄色在线看| 91黄色小网站| 中文字幕在线观看日| 中国 免费 av| 国产精品久久中文字幕| 北条麻妃av高潮尖叫在线观看| av在线无限看| 国产av不卡一区二区| 男女日批视频在线观看| 成人精品小视频| 91大神免费观看| 男人添女人荫蒂免费视频| av动漫在线观看| 三日本三级少妇三级99| h无码动漫在线观看| 日本精品www| 亚洲免费视频播放|