<abbr id="00ggy"><source id="00ggy"></source></abbr>
  • 
    
    <strike id="00ggy"></strike>
  • <bdo id="00ggy"></bdo>
  • <li id="00ggy"><source id="00ggy"></source></li>
  • <li id="00ggy"><source id="00ggy"></source></li>
    Search for the product you are looking for
    研發中心

    News

    Slide down

    How to Test the Temperature Recovery Time of a Thermal Shock Chamber

    Source:LINPIN Time:2025-03-26 Category:Industry News

    If the temperature recovery time falls outside the specified range, it can affect the test results of the thermal shock chamber. To routinely test the temperature recovery time of the equipment, you can follow the steps below.

    Process for Testing Recovery Time:

    Install the temperature measurement sensor at the designated position in the thermal shock chamber.
    Adjust the temperature controls of the low-temperature chamber and high-temperature chamber to the required values.
    Allow the chambers to achieve the desired heating and cooling temperatures.

    thermal shock chamber
    Once the equipment enters the temperature control state, stabilize it for half an hour or according to the product technical requirements, and record the temperature at the measurement points.
    Place the test load into the high-temperature chamber and select the appropriate holding time based on relevant standards and product technical conditions.
    Set the equipment’s transition time and transfer the test load from the high-temperature chamber to the low-temperature chamber. Observe and record the temperature at the measurement points during this process.
    Repeat the same method to transfer the test load from the low-temperature chamber back to the high-temperature chamber, while observing and recording the temperature at the measurement points.
    After recording the two scenarios—transferring the test load from the high-temperature chamber to the low-temperature chamber and vice versa—measure the shortest time required for the temperature at the measurement points to return to the state before the test load was placed.
    Linpin is a manufacturer of thermal shock chambers. For any questions regarding test equipment, you can consult our technical staff, who will provide tailored solutions based on your needs. The above outlines the main workflow for testing the temperature recovery time of the equipment. Through this explanation, we hope you have gained a deeper understanding of the relevant equipment. Thermal shock chambers are structurally divided into two-chamber and three-chamber types, and the workflow may vary slightly depending on the structure. For more information about the equipment, please visit our company website or call 400-066-2888 to inquire about the relevant parameters.

    News Recommendation
    One point of plowing, one point of harvest. At the beginning of the new year, the branches and subsidiaries of LFG have delivered brilliant report cards with successive good news. A white horse passes by, the years go by like a shuttle, what changes is the cycle of time and space, what remains unchanged is the seriousness and persistence of LF people.
    After prolonged use of a temperature and humidity test chamber, certain components or systems may develop issues, such as sediment buildup in the water system. To ensure accurate test results, regular cleaning of the water system is essential.
    However, the LINPIN product series, with its various types and models of salt spray test chambers
    Cold and thermal shock test chamber on the market is divided into two categories, a two-compartment type, including high-temperature region and low-temperature region, the test object were tested in two different temperatures in the area of the test, alternating hot and cold test; the other is a three-compartment type, in addition to high-temperature and low-temperature areas, there is also a test area, and the difference between the two-compartment is that the three-compartment type does not need to be tested directly in the test area.
    Correct operation of the temperature control system of a salt spray test chamber is extremely important because it ensures the accuracy of the test.
    Product Recommendation
    亚洲日韩v无码中文字幕| 日韩人妻无码精品无码中文字幕 | 亚洲av综合avav中文| 最新高清无码专区| 精品人妻中文字幕有码在线| 精品少妇无码AV无码专区| 精品久久久无码21p发布 | 中文字幕在线免费看线人 | 视频二区中文字幕| 免费VA在线观看无码| 无码国产69精品久久久久网站| 久久精品99无色码中文字幕| 狠狠躁天天躁中文字幕无码| 国产a级理论片无码老男人| 亚洲中文字幕无码久久2017| 亚洲欧美日韩中文字幕二区| 久久精品天天中文字幕人妻| 亚洲精品无码AV中文字幕电影网站| 手机永久无码国产AV毛片| 国模无码人体一区二区| 亚洲中文久久精品无码ww16| 免费a级毛片无码免费视频| 国产成人亚洲综合无码精品| 无码日韩精品一区二区免费暖暖 | 日日麻批免费40分钟无码| 中文字幕人妻无码专区| 最好看的电影2019中文字幕| 日本高清免费中文在线看| 在线中文字幕一区| 中文字幕日韩一区二区三区不卡| 人妻少妇精品中文字幕AV | 亚洲福利中文字幕在线网址| 中文字幕在线一区二区在线| 中文字幕一区图| 无码夫の前で人妻を犯す中字| 中文字幕不卡高清视频在线| 无码国产精品一区二区免费式影视| 无码人妻少妇久久中文字幕 | 中文字幕无码无码专区| 曰批全过程免费视频在线观看无码| 精品欧洲av无码一区二区14|