<abbr id="00ggy"><source id="00ggy"></source></abbr>
  • 
    
    <strike id="00ggy"></strike>
  • <bdo id="00ggy"></bdo>
  • <li id="00ggy"><source id="00ggy"></source></li>
  • <li id="00ggy"><source id="00ggy"></source></li>
    Search for the product you are looking for
    研發中心

    News

    Slide down

    How to Wire a UV Aging Test Chamber

    Source:LINPIN Time:2025-02-28 Category:Industry News

    If a UV aging test chamber is not wired correctly, the equipment will not function properly. Therefore, wiring is a fundamental task. Specifically, how is the wiring of the test chamber carried out? In fact, the wiring work of the test chamber should be performed by a professional electrician. Customers who are interested can also follow along with the editor to learn about the specific wiring details of the equipment.
    Please note: The wiring of a UV aging test chamber should be carried out under the guidance of professionals (usually professional electricians or technical personnel are responsible for the installation). Before installation, it is necessary to confirm whether the electrical capacity of the main switch of the test chamber meets the requirements of the equipment. When wiring:
    Grounding Wires: Do not connect the grounding wire of the test chamber to a water-related location (such as a water pipe) or to the neutral line of the power supply. The grounding wire (yellow-green wire) must be accurately connected to the grounding terminal to ensure that the leakage circuit breaker can immediately cut off the main power supply in case of equipment leakage, preventing electric shock accidents.
    Neutral Line: During operation, the test chamber may experience an imbalance in three-phase current, resulting in a significant current on the neutral line. Therefore, the cross-sectional area of the neutral line must be close to that of the phase line.
    Safety Precautions: When wiring, always ensure the correctness of the operation and take safety precautions.
    Electrical Requirements During Operation
    After the wiring is completed, the UV aging test chamber also has certain requirements for its daily operation. The equipment must be continuously supplied with stable voltage and current. If the voltage is unstable, the test work may not proceed correctly. In such cases, contact an electrician promptly. Additionally:
    Dedicated Power Supply: Do not share the same main switch with other electrical devices to avoid short circuits that could affect the normal use of the test chamber.
    Power Off After Use: After completing the test, turn off the corresponding power supply. When performing routine maintenance and cleaning of the equipment, ensure that the power is off to guarantee electrical safety.
    By following these guidelines, you can ensure the safe and efficient operation of the UV aging test chamber.

    News Recommendation
    Cold and hot shock test chambers utilize high-temperature and low-temperature zones during testing. In the testing process, two-box models involve placing the test product in high and low-temperature zones for cyclic exposure, while three-box models involve blowing high- and low-temperature gases onto the product alternately.
    Adjusting the wind speed is crucial for dust and sand test chambers, as it directly affects the test results of the specimens. What are the specific requirements for wind speed during the operation of these chambers? Today, let's delve into the details together.
    As a large, high-precision environmental simulation testing instrument, the salt spray test chamber requires careful attention during installation to ensure its proper operation and accurate testing.
    High and low temperature alternating test chambers are composed of many components, each playing a critical role in the operation of the equipment. Today, we will focus on the heating element, providing a deeper understanding of this essential part of the testing device.
    If the temperature recovery time falls outside the specified range, it can affect the test results of the thermal shock chamber. To routinely test the temperature recovery time of the equipment, you can follow the steps below.
    Product Recommendation
    Telegram WhatsApp Facebook VK LinkedIn
    中文字幕无码高清晰| 无码人妻精品一区二区三18禁 | 亚洲午夜无码片在线观看影院猛 | 亚洲欧美日韩、中文字幕不卡| 亚洲真人无码永久在线| 午夜不卡无码中文字幕影院| 精品久久久久久无码专区| 伊人蕉久中文字幕无码专区| 亚洲成A∨人片天堂网无码| 蜜桃臀无码内射一区二区三区| 无码福利一区二区三区| 中文字幕在线观看亚洲| 夜夜精品无码一区二区三区| 99久久人妻无码精品系列蜜桃 | 国产精品VA在线观看无码不卡| 精品人妻无码区二区三区| 欧美麻豆久久久久久中文| 日韩精品久久无码人妻中文字幕| 亚洲AV无码资源在线观看| 久久亚洲AV成人无码电影| 亚洲AV无码专区在线播放中文| 伊人蕉久中文字幕无码专区| 视频一区二区中文字幕| 中文字幕一区在线观看视频| 亚洲欧美日韩在线中文字幕 | 久久中文精品无码中文字幕| 亚洲韩国—中文字幕| 久久久噜噜噜久久中文福利| 亚洲AV中文无码乱人伦在线观看 | 中文字幕乱码久久午夜| 中文字幕在线无码一区| 亚洲精品国产日韩无码AV永久免费网 | 制服在线无码专区| 亚洲七七久久精品中文国产| 国产中文字幕乱人伦在线观看| 天堂资源在线最新版天堂中文| 在线中文字幕一区| 亚洲毛片网址在线观看中文字幕| 亚洲欧洲中文日韩久久AV乱码| 日本无码小泬粉嫩精品图| 亚洲中文字幕无码永久在线|